Gacha Drop Rate Calculator
Computes the cumulative chance of at least one drop over a number of pulls, the ceiling of k/p as a rounded-up estimate of pulls for a chosen number of copies (not the exact mean k/p), and pull counts for 50%, 90% and 99% probability milestones.
Real-time Results
Milestone Pull Counts
| Item | Value |
|---|---|
| 50% chance of at least 1 | 116 pulls |
| 90% chance of at least 1 | 383 pulls |
| 99% chance of at least 1 | 766 pulls |
| Expected pulls for 1 copy | 167 pulls |
| Expected pulls for 1 copies | 167 pulls |
How it works
Estimate how likely at least one drop is across a fixed number of pulls, and how many pulls are typically needed for one or more copies. It also lists pull counts for 50%, 90% and 99% cumulative probability.
Does the probability card account for Number Desired?
No. The probability card always reports the chance of at least one drop in the entered attempts, using 1 - (1 - p)^n. Number Desired only affects the expected-pulls card and the expected-copies list entry, so a request for 3 copies still shows the at-least-one probability.
How does the Pity Limit affect the numbers?
The pity value is not used in any probability or expected-pull calculation. When it is greater than 0, it only adds a list line stating the guaranteed pull count. The milestone and expected values remain the plain independent-attempt results, so a pity system's real effect is not modeled.
Examples and interpretation(2)
What is the chance of at least one drop at 0.6% over 100 pulls?
- Base Drop Rate (%)
- 0.6 %
- Number of Attempts / Pulls
- 100
- Pity Limit (0 = no pity)
- 0
- Number Desired
- 1
- Convert the rate: p = 0.6/100 = 0.006.
- Compute 1 - 0.994^100 ≈ 0.4522, shown as 45.22%.
- Rounded-up reciprocal for 1 copy = ceil(1/0.006) = 167.
- Probability in 100 Pulls
- 45.22%
- Expected Pulls for the chosen number of copies (engine shows 'Expected Pulls for N copy')
- 167
About a 45% chance of at least one drop in 100 pulls, with 167 pulls as the rounded-up estimate for one copy. The expected-pulls figure is a rounded-up estimate, not a guarantee.
How many pulls are expected for 3 copies at a 1% rate over 50 pulls?
- Base Drop Rate (%)
- 1 %
- Number of Attempts / Pulls
- 50
- Pity Limit (0 = no pity)
- 0
- Number Desired
- 3
- Convert the rate: p = 1/100 = 0.01.
- Compute 1 - 0.99^50 ≈ 0.3950, shown as 39.50%.
- Expected pulls for 3 copies = ceil(3/0.01) = 300.
- Probability in 100 Pulls
- 39.50%
- Expected Pulls for the chosen number of copies (engine shows 'Expected Pulls for N copy')
- 300
The probability card still describes at least one copy, not three. The 300-pull figure is the ceiling of k/p (here exactly 300) and ignores pity and any rate changes.
Formula
p = Base Drop Rate (%)/100; P(at least one in n) = 1 - (1 - p)^n; expected pulls for k copies = ceil(k/p); pulls for probability q = ceil(ln(1-q)/ln(1-p)).
How to use
- Enter the single-attempt Base Drop Rate (%) as a percentage, for example 0.6 for 0.6%.
- Enter the Number of Attempts / Pulls you plan to make.
- Set Number Desired to the number of copies you want; this changes the expected-pulls card and the expected-copies list entry.
- Optionally enter a Pity Limit to add a guaranteed-drop line to the milestone list; leave 0 for no pity.
- Read the probability card, the expected-pulls card and the milestone list.
Frequently asked questions
Why does the expected-pulls card change when I change Number Desired?
The card uses ceil(desired/p), so it scales linearly with the number of copies. The probability card does not change with Number Desired.
Are the milestone pull counts affected by the pity limit?
No. The 50%, 90% and 99% milestones use ceil(ln(1-q)/ln(1-p)) from the base rate only. A positive pity limit just adds a separate guaranteed-pull line.
What happens if I enter a base rate of 100%?
The probability card shows 100.00% for any attempt count of 1 or more, and expected pulls become ceil(1/1) = 1. Rates are entered as percentages, so 100 means a certain drop each attempt.
Related Calculators
More calculators selected by category and topic.
